The Prediction of oil production by water flood through 2022 and gas injection by 2026.

Project include

  • Petrophysical analyses on 28 wells, wireline logs and core data analysis
  • Object modeling, geocellular model was upscaled into a 45 x 70 x 16 grid
  • Production history matched
  • Additional six water and gas injection cases.
  • Multi-disciplinary study geophysicists, petrophysicists, geologists, and reservoir engineers

Duration of study – 9 months

Contact Us

Plot 6 Block 86, Godwin Omenne Street
Off Chief Collins Uchidiuno Street
Lekki Phase 1, Lagos.

 

JoomShaper